NAICS University · Free research for insurance agents
NAICS University Editorial Team
Framing Contractors
NAICS 238130 · United States · 2022 edition
Data last updated 2026-10-17 · Classification: 2022 NAICS (U.S. Census Bureau)
For educational purposes only, for licensed insurance professionals. Profile explanations and insurance notes were drafted with automated tools and have not each been checked by a licensed insurance professional. They are not underwriting, coverage, legal, or tax advice, and NAICS University does not sell, recommend, or place insurance. Confirm the classification on the U.S. Census Bureau 2022 NAICS page, and confirm any insurance question with the carrier, the policy forms, and a licensed professional.
This industry comprises establishments primarily engaged in structural framing and sheathing using materials other than structural steel or concrete. The work performed may include new work, additions, alterations, maintenance, and repairs.
Activities described by this code
Illustrative examples imported with this Census record.
Building framing (except structural steel)
Post framing contractors
Foundation, building, wood, contractors
Steel framing contractors
Framing contractors
Wood frame component (e.g., truss) fabrication on site
Other activities to examine
Cross-references imported with this Census record. They flag boundaries to examine, not a policy decision.
Framing contractors erect the structural skeleton of buildings — cutting and assembling wood, light-gauge steel, or engineered lumber into wall systems, floor systems, and roof structures. Work is performed almost entirely on client-owned job sites, typically under a general contractor, and may include sheathing installation and on-site assembly of prefabricated components like trusses. Projects range from single-family homes to large commercial buildings depending on the contractor's specialization.
Insurance research summary
Completed operations and workers' comp severity dominate the framing contractor risk profile — structural work means high-consequence claims when things go wrong.
Educational note
Start the review with completed operations.
For Framing Contractors, the saved research highlights completed operations, employee injuries, fall exposure. Confirm how these arise in the actual operation, what controls are used and whether additional services change the proposed coverage.
Completed operations — structural framing failures after project completion can result in catastrophic, high-severity claims years after the work is done.
Employee injuries — framing involves elevated work, heavy lumber handling, power tools, and nail guns, producing among the higher workers' comp injury rates in construction.
Fall exposure — workers operate at height on open floors, wall tops, and roof structures without full enclosure, creating significant OSHA and workers' comp exposure.
Subcontractor liability — use of uninsured or underinsured subs can pull framing contractors into claims for work they didn't directly perform.
Faulty workmanship — improperly framed walls, headers, or structural connections may not manifest until subsequent trades or occupancy reveals defects.
Third-party property damage — work near occupied structures or with heavy equipment on congested job sites creates ongoing property damage exposure.
Typical coverages
Workers' Compensation
Framing is one of the higher-hazard construction class codes — payroll volume and experience modification are typically the dominant cost drivers.
Drivers: Payroll, class code, experience mod, state, subcontractor certificate management
General Liability
Covers premises, ongoing operations, and critically, completed operations — structural exposure warrants careful attention to completed-ops limits and tail coverage.
Drivers: Revenue, project type (residential vs. commercial), subcontractor use, claims history, completed-ops limits
Umbrella / Excess Liability
Structural framing severity often justifies meaningful excess limits; GCs frequently require minimum limits that exceed underlying primary.
Drivers: Underlying limits, project scale, GC or contract requirements, claims history
Commercial Auto
Crew trucks, flatbeds, and trailers hauling lumber and equipment to job sites are typically a meaningful part of the fleet.
Drivers: Number of vehicles, driver records, vehicle type, radius of operation
Inland Marine / Tools and Equipment
Framing crews typically carry significant power tool inventory, nail guns, compressors, and sometimes small equipment — often underinsured on a standard property form.
Covers office, storage yard, and any owned shop or prefab space — often modest for site-based contractors but relevant if shop or yard operations exist.
Drivers: Building value, contents, construction, protection class, storage yard
Contractors Professional Liability
Worth considering when framing contractors provide design-assist, layout services, or component specification — increasingly common on complex projects.
Completed-operations tail — framing work can produce structural claims well after project completion; the policy period when the work was performed is typically what responds, making prior-acts and tail coverage worth understanding.
Subcontractor certificates of insurance — when framing subs are used, uncertified or lapsed sub coverage often pulls the GC's liability back to the primary insured's policy.
Wrap-up / OCIP exclusions — on larger commercial projects, owner-controlled or contractor-controlled insurance programs may exclude certain coverages, and the framing contractor may unknowingly have gaps in their own policy.
Leased or rented equipment — large lifts, scissor lifts, and forklifts rented for framing operations may not be covered under standard inland marine without a rented/leased equipment endorsement.
Employment practices liability — crew-intensive operations with seasonal labor fluctuation can create wage, discrimination, or misclassification exposure worth discussing.
Underwriting red flags
Significant commercial or multi-story framing, particularly on projects with design-assist responsibility.
Prior completed-operations or structural defect claims, especially those reaching excess layers.
Heavy subcontractor use without documented certificate tracking and additional insured compliance.
Operations classified or misclassified as framing but actually involving structural steel, precast concrete, or tilt-up work.
Storm-chaser or catastrophe-response framing repair work with compressed timelines and unfamiliar geography.
Difficulty documenting revenue split between residential and commercial project types.
Claim scenarios
Fictional discussion prompts. These examples do not determine coverage or predict claim payment.
Structural framing failure after occupancy
A framing contractor completes a multi-unit residential building; several years after occupancy, a wall system shows signs of failure traced to improper header sizing.
Worker fall from open floor structure
A framing crew member falls through an unsheathed second-floor opening and sustains serious injuries.
Tool theft from job site overnight
A full set of framing tools — nail guns, compressors, circular saws — is stolen from a job site trailer overnight.
Crane or lift damages neighboring structure
A rented lift used to set roof trusses swings into an adjacent occupied building, damaging a wall.
Questions to ask
Use these prompts with the insured and the underwriter.
What is the split between residential and commercial framing work, and does the insured do any multi-story or complex commercial projects?
Does the insured use subcontractors, and if so, is there a documented process for collecting and tracking certificates of insurance?
Is any design-assist, truss specification, or structural layout work performed — or is the insured strictly field framing only?
Are there any on-site truss or component fabrication operations, or is all prefab material purchased from third-party suppliers?
What is the prior loss history, specifically any completed-operations or structural defect claims?
Are any projects performed under wrap-up programs (OCIP/CCIP), and does the insured understand how those programs interact with their own coverage?
What owned and non-owned vehicles are in the fleet, and are there any CDL drivers or oversized load hauls?
What is the insured's geographic footprint — single state, regional, or multi-state operations?
Poured concrete foundation contractors often work immediately before framing begins on the same project and are sometimes confused with post-frame or slab-involved framing work.
Site preparation contractors frequently work alongside framing crews and can be confused with framing when demolition or structural removal is involved.
Other specialty trade contractors — including those doing prefabricated component installation — may be classified alongside or instead of 238130 when scope blurs.
New single-family home construction GCs often self-perform framing; classification ambiguity arises when a framing sub is also functioning as the project GC.
Terms named in this profile’s saved research. Definitions are not supplied here.
Completed Operations
Wrap-up / OCIP / CCIP
Experience Modification (Mod)
Inland Marine
Contractors Professional Liability
Additional Insured
Design-Assist
Certificate of Insurance
Tail Coverage
Seasonal and special factors
Framing activity in northern climates tends to concentrate in spring through fall, with winter slowdowns affecting payroll and revenue reporting — worth understanding when auditing workers' comp or setting policy deposit premiums. Storm-related repair surges (e.g., after hail or wind events that damage roofs and wall systems) can temporarily expand a framing contractor's scope and geography, sometimes creating underwriting concerns about operations outside their normal market.